Unitized curtain wall vs stick system.
Unitised curtain walls and stick built systems are the two main classifications of curtain wall systems.
Unitised systems are made of large units and erected on the building facade.
In either stick built or unitized systems curtain wall provides superior structural strength.
In other words the differences mainly lie in their method of installation.
Unitized can offer performance.
Less than 3 000 m2 go for stick.
This is mostly adopted in low rise and mid rise buildings.
Unitized systems are fully assembled in the factory and installation being done on site with the help of cranage facilities benefiting from.
The entire fenestration system essentially locks together providing excellent protection against high wind loads and earthquakes.
Stick built and unitized systems.
Due to the great structural strength curtain wall can handle larger glass sizes than window wall.
On the other hand stick built curtain walls are installed piece by piece.
On the average smaller projects tend to make more sense for stick curtain wall since the lead times are shorter and there are less expensive prefabbed pieces.
The curtain wall construction is classified as two as stick system and unitized system.
In cases where the wall configuration seems as complex and having more corners and drastic changes in the plane the stick system would be more economical.
For larger projects in major cities unitized is now more or less the standard.
Offers a detailed description of stick built and unitized curtain walls including system types thermal performance characteristics acoustic and aesthetic features and.
Unitized systems can be economically friendly shifting labor expense from field to factory.
Unitized curtain wall systems are comprised of large units that are assembled and glazed in the factory.
Stick systems are installed on site with the frame sequence followed by glazing and are being placed on scaffolding or cradle facilities where you require more manpower on site than unitized glazing.
For a standard curtain wall in a typical all glazed building the borderline sits somewhere between 3 000 and 5 000 m2.
They are then shipped to the job site and erected on the building façade.
High speed installation reduced field installation costs by maintaining high quality control with very minimum on site manpower.