Unitized curtain wall system installation pdf.
If your project doesn t suit most of the criteria for a unitized system your other option is to use a stick built system.
Since unitized curtain walls are the current state of the art in curtain wall technology designers consultants and contractors alike need to become familiar with these systems technical limitations so that we can develop effective designs that address their use for all areas of the building enclosure.
Sealant all sealant must meet astm c 920 class 50.
The size of the unitized curtain walls are dependent on the floor to floor height of the building.
March 18 2016 installation notes 1.
General notes and guidelines f.
Ycu 750 tu unitized curtain wall system page 10 04 4013 00 effective date.
For the purposes of these instructions sealant is to be defined as the following.
Possible installation solution standard element installation detail of standard bracket functionalities.
April 22 2010 unit installation step 4 install l anchor note.
The vast majority of low to mid rise curtain walls are installed in this way.
Here the reynaers aluminium cw 65 ef unitized façade system is employed to great effect.
Move and stack boxes with proper support to prevent distortion.
Plan details slab anchor.
To install fire insulation according to approved shop drawing at top part of concrete beam surface prior to curtain wall installation.
Do not drop roll or drag boxes of aluminum framing.
Curtain wall units are then hoisted up from the loading platform by means of this monorail and electric chain block and place in position at floor edge for fixing to the pre installed anchor brackets.
System information curtain wall 65 element façade is a cost efficient curtain wall system for element façades with.
Individual installation of each component are not necessary as in sticky curtain wall system.
A desire for speed of.
8250xd unitized curtain wall system 11 21 2019 page 4 section 1.
If fork lifts are used be especially careful about striking the boxes when lifting or moving.
Hence it is essential to keep in mind the mode of transportation and installation while planning the depth of facade.
All aluminum anchors and aluminum components of the curtainwall system must be separated from the structural steel and concrete with a nylon separator or material of similar compatibility.
Safely and swiftly you can expect our highly methodized system to follow through on its shipping promise.